Friday, October 25, 2013

Brynmor Jones Library redevelopment update



What’s going on?

·         Books from the 5th floor have now been moved to the decant area on the ground floor.  More details of all book locations can be found at http://www2.hull.ac.uk/lli/pdf/where-are-the-books-now.pdf

·         PCs on the 2nd floor have been removed and this floor will be closed with effect from 5.00pm today, Friday 25 October

·         The remainder of the first floor of the east building and its second floor should open by the end of November.  These areas contain informal seating areas, group study rooms with AV equipment, 16 PCs and 90 individual study spaces

When’s it happening?

·         The 2nd floor of the tower will close on Friday 25 October at 5.00pm